1/16/2024 0 Comments Easypower with crackCoordination studies: Done in-house and incorporated onto the electrical permit documents, as mandated by the NEC, with specifications requiring a separate, delegated study.ĭelegation is most appropriate for items #3 and #4, as there is a good chance that whatever overcurrent protective device manufacturer (Probably Schneider Electric/SquareD) you used as your basis-of-design is not going to be what the electrical contractor ends up submitting and installing.Arc-flash calculations: Delegated to the electrical contractor, unless otherwise required by the Owner. Voltage drop study: Done in-house and incorporated onto the electrical permit documents, as mandated by our building code and state statutes, with specifications requiring a separate, delegated study.Short-circuit study: Done in-house and incorporated onto the electrical permit documents, as mandated by our building code and state statutes, with specifications requiring a separate, delegated study.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |